PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Carpenters stripped the forms at the Stairwell -4 (800x600).jpg Gas piping at the 1st Floor Facing West (600x800).jpg Installing split wires at the 1st floor Facing South-West (800x600).jpg Split wire at the 1st Floor at the Sprinkler Room Facing South-East (800x600).jpg